2 Bray
Street

Home automation proposal

Proposal vision

Comfort, efficiency and simplicity - one intelligent system working quietly across the entire home.
North Sydney, NSW

01 / Proposal options

Two approaches.
One connected home.

Choose between a focused automation package and the complete system. The detailed scope below changes with your selection, while the investment is intentionally presented near the end.

02

Complete automation package

Proposal 2

A complete engineered system with dedicated infrastructure, control cabinetry, commissioning and support, plus three clearly separated optional systems.

  • Eleven included proposal groups
  • Three optional systems shown separately
  • Commissioning, training and support included

02 / Proposal 2 scope

Every system.
Clearly explained.

Open a proposal group to read its client description and review its individual commercial total.

Loxone home automation system9 proposal groups

The core systems working together across the home.

03 / Explore the home

One floor.
Every detail.

Select a level, pinch or scroll over the plan to zoom, and choose a numbered point to reveal that detail.

Explore the floorPinch or scroll to zoom. Tap a point for detail.
Ground floor automation floorplan

04 / Before we begin

Designed clearly.
Delivered carefully.

The proposal becomes a coordinated system through detailed engineering, compatibility confirmation and clear decisions before rough-in and wall closure.

01

Coordination

Third-party equipment must be confirmed compatible before commissioning. Final schedules and integrations remain subject to coordination.

02

By others

Electrical and data cabling, internet services, fittings, blind motors and structural or joinery work are excluded unless explicitly listed.

03

Existing systems

Hunter irrigation, Bond Hub blinds and Inner Range monitoring are integration allowances subject to confirmation and testing.

04

Final engineering

Cabinet space, power, pathways and device locations must be approved before wall closure. Uncoordinated changes may alter the final scope.

05 / Terms and conditions

Clear from
the beginning.

These are the commercial exclusions and coordination conditions attached to the proposal. The downloadable proposal contains the complete acceptance record.

Exclusions

  1. Electrical cabling and data cabling unless explicitly specified.
  2. NBN services, internet services and communications infrastructure unless explicitly specified.
  3. Third-party products such as appliances, motorised blinds and exhaust fans unless explicitly specified.
  4. Light fittings, fans, blind motors, structural work, wall chasing, conduit and joinery modifications.

Project conditions

  1. Third-party equipment must be confirmed compatible before commissioning, and Integratd Living must be notified early of equipment supplied by others that will interface with the automation system.
  2. Dedicated control-cabinet space, power infrastructure, accessible cable pathways and confirmed device locations are required before site attendance.
  3. Specialised Tree cabling and device locations must be approved before wall closure. Rework or delays caused by uncoordinated changes may incur additional charges.
  4. Integratd Living is not responsible for third-party systems unless explicitly included. Programming changes requested after user training are billable.

06 / Investment

The complete picture.
Now in context.

You have now seen the proposal, the systems and how they come together throughout the home. Select either proposal to review its complete investment.

Payment structure

20% design and documentation

70% prior to equipment procurement

10% on commissioning

Proposal 211 included + 3 optional
Proposal subtotal$80,291.12ex GST
GST$8,029.11
Total investment$88,320.23including GST

Special components may be supplied early where required for rough-in or casting. All other inclusions, exclusions and conditions are recorded in the proposal.

Next step

Review it.
Then make it yours.

We can walk through either proposal together, refine the scope and answer any questions before acceptance.